gurixandClaude Opus 4.6 0bda51df7a docs(03-01): complete data layer foundation plan
- SUMMARY.md with execution results
- STATE.md updated with position and decisions
- ROADMAP.md updated with plan progress

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-29 13:43:44 +02:00

4.6 KiB

phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established requirements-completed duration completed
03-komplettes-spielerlebnis 01 game-data
word-lists
typing
progress-tracking
rate-limiting
phase provides
01-technische-basis Level definitions with allKeys, Progress interface, IndexedDB storage
phase provides
02-gemini-integration Gemini API with rate limiting
Static word lists per level (1-6) with getWordsForLevel()
Extended Progress interface with accuracy tracking fields
LessonPhase type (discover | practice | words)
Updated rate limits: 10 text / 5 image per day
03-02-lesson-flow
03-03-reward-system
03-04-parent-area
added patterns
TDD for game data validation
letter-only validation against level allKeys
created modified
src/game/words.ts
src/game/words.test.ts
src/types.ts
src/api/gemini.ts
src/ui/screens.ts
src/api/gemini.test.ts
src/storage/db.test.ts
Levels 1-2 use letter combos (no real German words possible with F/J/D/K)
Rate limits raised to 10 text / 5 image per day for real usage
Word list validation: every word checked against getKeysUpToLevel() at test time
LEVL-04
TYPE-06
3min 2026-03-29

Phase 03 Plan 01: Data Layer Foundation Summary

Word lists for levels 1-6 with TDD validation, extended Progress with accuracy stats, rate limits 10/5 per day

Performance

  • Duration: 3 min
  • Started: 2026-03-29T11:39:57Z
  • Completed: 2026-03-29T11:42:37Z
  • Tasks: 2
  • Files modified: 7

Accomplishments

  • Word lists for levels 1-6 (8-10 words each), validated to only use learned letters per level
  • getWordsForLevel() with without-replacement and with-replacement sampling
  • Progress interface extended with totalCorrect, totalErrors, errorKeyCounts, lastPlayedLevels
  • LessonPhase type exported for lesson flow phases
  • Rate limits updated from 1/1 to 10 text / 5 image per day

Task Commits

Each task was committed atomically:

  1. Task 1: Word lists per level with validation tests - 420c0e1 (test: RED), 5a6ba70 (feat: GREEN)
  2. Task 2: Extend Progress type and update rate limits - d4207bf (feat)

Files Created/Modified

  • src/game/words.ts - Static word lists per level, getWordsForLevel() function
  • src/game/words.test.ts - 8 tests validating word lists against level keys
  • src/types.ts - Extended Progress interface, new LessonPhase type
  • src/api/gemini.ts - Rate limit constants TEXT_RATE_LIMIT=10, IMAGE_RATE_LIMIT=5
  • src/ui/screens.ts - New Progress field defaults in welcome screen
  • src/api/gemini.test.ts - Updated rate limit tests for new limits
  • src/storage/db.test.ts - Updated Progress test fixture with new fields

Decisions Made

  • Levels 1-2 use letter combination patterns since no real German words can be formed with only F/J/D/K
  • Rate limits raised to 10 text / 5 image per day (was 1 each) for practical usage

Deviations from Plan

Auto-fixed Issues

1. [Rule 1 - Bug] Fixed invalid letters in word lists

  • Found during: Task 1 (TDD GREEN phase)
  • Issue: Plan's suggested words contained letters not in level allKeys (e.g., "halb" has "b" not in level 5, "salad" has letters not in level 4)
  • Fix: Replaced invalid words with valid alternatives using only level-appropriate letters
  • Files modified: src/game/words.ts
  • Verification: All 8 word validation tests pass
  • Committed in: 5a6ba70 (Task 1 GREEN commit)

2. [Rule 1 - Bug] Updated existing tests for new rate limits and Progress shape

  • Found during: Task 2 (verification step)
  • Issue: Existing tests expected old rate limit of 1 and old Progress shape without new fields
  • Fix: Updated gemini.test.ts to call incrementApiCall 10/5 times, added new fields to db.test.ts fixture
  • Files modified: src/api/gemini.test.ts, src/storage/db.test.ts
  • Verification: All 76 tests pass, tsc --noEmit clean
  • Committed in: d4207bf (Task 2 commit)

Total deviations: 2 auto-fixed (2 bugs) Impact on plan: Both fixes necessary for correctness. No scope creep.

Issues Encountered

None beyond the auto-fixed deviations above.

User Setup Required

None - no external service configuration required.

Next Phase Readiness

  • Word lists ready for lesson flow (03-02)
  • Progress stats fields ready for parent area (03-04)
  • LessonPhase type ready for lesson screen phases (03-02)
  • Rate limits configured for reward system API calls (03-03)

Phase: 03-komplettes-spielerlebnis Completed: 2026-03-29