- SUMMARY: 6 IndexedDB accessors + 9 generated assets via Gemini API - STATE: advance to plan 4/5, 90% progress - ROADMAP: update phase 02 plan progress - REQUIREMENTS: mark ASST-01, ASST-02 complete Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
5.2 KiB
5.2 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | ||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 02-gemini-integration-asset-pipeline | 03 | assets |
|
|
|
|
|
|
|
|
|
6min | 2026-03-29 |
Phase 02 Plan 03: Asset Generation Summary
IndexedDB store accessors + Gemini-powered build script generating 4 character sheets, 4 avatars, and 1 style reference image
Performance
- Duration: 6 min
- Started: 2026-03-29T10:04:23Z
- Completed: 2026-03-29T10:10:30Z
- Tasks: 2
- Files modified: 12
Accomplishments
- Added 6 IndexedDB accessor methods (save/get for companionAssets, styleReference, forestElements)
- Created build script that calls Gemini API to generate character sheets with 3 views (front, side, face) and matching avatars
- Generated all 9 PNG assets: 4 character sheets, 4 avatars, 1 style reference (initial forest scene)
- Script is re-runnable (skips existing assets) with graceful error handling
Task Commits
Each task was committed atomically:
- Task 1: Add IndexedDB accessor methods for remaining stores -
a242ce1(feat) - Task 2: Build script for asset generation + run it -
1fa7d52(feat)
Files Created/Modified
src/storage/db.ts- Added saveCompanionAssets, getCompanionAssets, saveStyleReference, getStyleReference, saveForestElement, getForestElementsscripts/generate-assets.ts- Build script reading config.json, calling Gemini API, saving 9 PNGspackage.json- Added tsx devDependency and generate-assets npm scriptsrc/assets/companions/*/character-sheet.png- Character sheets (3-view: front, side, face) for all 4 companionssrc/assets/companions/*/avatar.png- Portrait avatars for all 4 companionssrc/assets/style-reference/initial-forest-scene.png- Watercolor forest clearing style reference
Decisions Made
- Fixed imageModel name in config.json (gemini-3.1-flash-preview-image was 404, corrected to gemini-3.1-flash-image-preview)
- Script skips already-generated assets (checks file existence + size > 1KB) for idempotent re-runs
- Added 2-second delay between API calls to respect rate limits
- Avatar generation uses character sheet as reference image for visual consistency
Deviations from Plan
Auto-fixed Issues
1. [Rule 1 - Bug] Fixed incorrect image model name in config.json
- Found during: Task 2 (running generate-assets script)
- Issue: Model name
gemini-3.1-flash-preview-imagereturns 404; correct name isgemini-3.1-flash-image-preview - Fix: Updated public/config.json imageModel field
- Files modified: public/config.json (gitignored)
- Verification: API returns 200 and generates images successfully
- Committed in: Not committed (file is gitignored), but documented for user awareness
Total deviations: 1 auto-fixed (1 bug) Impact on plan: Essential fix for API connectivity. No scope creep.
Issues Encountered
- Gemini API returned 404 for the configured imageModel name. Resolved by listing available models and correcting the name.
User Setup Required
None - Gemini API key already configured in public/config.json from Phase 1 setup.
Next Phase Readiness
- All character assets generated and committed to git
- IndexedDB store accessors ready for runtime use
- Style reference image available for consistent art direction in future forest element generation
- Ready for Plan 04 (companion integration) and Plan 05 (forest reward pipeline)
Self-Check: PASSED
All 10 created files verified present. Both task commits (a242ce1, 1fa7d52) verified in git log.
Phase: 02-gemini-integration-asset-pipeline Completed: 2026-03-29