66 lines
2.1 KiB
Markdown
66 lines
2.1 KiB
Markdown
# Project State
|
|||
|
|
|
||
|
|
## Project Reference
|
||
|
|
|
||
|
|
See: .planning/PROJECT.md (updated 2026-03-24)
|
||
|
|
|
||
|
|
**Core value:** Network traffic patterns are instantly recognizable as distinct sounds — a ping sounds different from HTTPS noise, which sounds different from a port scan.
|
||
|
|
**Current focus:** Phase 1 — Capture and Classification
|
||
|
|
|
||
|
|
## Current Position
|
||
|
|
|
||
|
|
Phase: 1 of 4 (Capture and Classification)
|
||
|
|
Plan: 0 of ? in current phase
|
||
|
|
Status: Ready to plan
|
||
|
|
Last activity: 2026-03-24 — Roadmap created, ready to plan Phase 1
|
||
|
|
|
||
|
|
Progress: [░░░░░░░░░░] 0%
|
||
|
|
|
||
|
|
## Performance Metrics
|
||
|
|
|
||
|
|
**Velocity:**
|
||
|
|
- Total plans completed: 0
|
||
|
|
- Average duration: —
|
||
|
|
- Total execution time: —
|
||
|
|
|
||
|
|
**By Phase:**
|
||
|
|
|
||
|
|
| Phase | Plans | Total | Avg/Plan |
|
||
|
|
|-------|-------|-------|----------|
|
||
|
|
| - | - | - | - |
|
||
|
|
|
||
|
|
**Recent Trend:**
|
||
|
|
- Last 5 plans: —
|
||
|
|
- Trend: —
|
||
|
|
|
||
|
|
*Updated after each plan completion*
|
||
|
|
|
||
|
|
## Accumulated Context
|
||
|
|
|
||
|
|
### Decisions
|
||
|
|
|
||
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
||
|
|
Recent decisions affecting current work:
|
||
|
|
|
||
|
|
- Use `github.com/gopacket/gopacket` v1.5.0 (community fork) — NOT `google/gopacket` which is unmaintained
|
||
|
|
- Use `github.com/packetcap/go-pcap` for live capture (pure Go, no CGo for capture layer)
|
||
|
|
- Use `github.com/sjzar/go-lame` v0.0.9 for MP3 encoding (embeds LAME C source, CGo required at build time only)
|
||
|
|
- Audio synthesis: hand-rolled additive sine oscillators + EMA amplitude smoothing (no external audio library)
|
||
|
|
- Frequency table: register-separated harmonics (low drones = bulk traffic, mid = control, high = interactive)
|
||
|
|
|
||
|
|
### Pending Todos
|
||
|
|
|
||
|
|
None yet.
|
||
|
|
|
||
|
|
### Blockers/Concerns
|
||
|
|
|
||
|
|
- Phase 2: Frequency mapping requires subjective listening validation — specific Hz values not determined by research; must test during Phase 2
|
||
|
|
- Phase 3: Auto-clustering algorithm choice (hash-bucketing vs k-means) deferred until synthesis engine exists to evaluate perceptual results
|
||
|
|
- macOS privilege model (BPF device vs CAP_NET_RAW) not verified by research — flag if macOS is a target during Phase 1
|
||
|
|
|
||
|
|
## Session Continuity
|
||
|
|
|
||
|
|
Last session: 2026-03-24
|
||
|
|
Stopped at: Roadmap written, REQUIREMENTS.md traceability updated — next step is /gsd:plan-phase 1
|
||
|
|
Resume file: None
|