Roadmap: NetSynth
Milestones
- v1.0 MVP — Phases 1-4 (shipped 2026-03-26)
Phases
v1.0 MVP (Phases 1-4) — SHIPPED 2026-03-26
- Phase 1: Capture and Classification (4/4 plans) — completed 2026-03-25
- Phase 2: Audio Synthesis Engine (3/3 plans) — completed 2026-03-26
- Phase 3: Pipeline Integration and MVP (2/2 plans) — completed 2026-03-26
- Phase 4: Power User Features (2/2 plans) — completed 2026-03-26
Full details: .planning/milestones/v1.0-ROADMAP.md
Progress
| Phase | Milestone | Plans Complete | Status | Completed |
|---|---|---|---|---|
| 1. Capture and Classification | v1.0 | 4/4 | Complete | 2026-03-25 |
| 2. Audio Synthesis Engine | v1.0 | 3/3 | Complete | 2026-03-26 |
| 3. Pipeline Integration and MVP | v1.0 | 2/2 | Complete | 2026-03-26 |
| 4. Power User Features | v1.0 | 2/2 | Complete | 2026-03-26 |