Files
yoloyolo/.planning/ROADMAP.md
T
gurixandClaude Opus 4.6 175ff96404 chore: complete v1.1 milestone — Custom Sound Mappings
Archive roadmap and requirements to milestones/, update PROJECT.md
with shipped state, collapse ROADMAP.md, update retrospective.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 22:05:09 +01:00

1.7 KiB

Roadmap: NetSynth

Milestones

  • v1.0 MVP — Phases 1-4 (shipped 2026-03-26)
  • v1.1 Custom Sound Mappings — Phases 5-7 (shipped 2026-03-26)

Phases

v1.0 MVP (Phases 1-4) — SHIPPED 2026-03-26
  • Phase 1: Capture and Classification - 4/4 plans — completed 2026-03-25
  • Phase 2: Audio Synthesis Engine - 3/3 plans — completed 2026-03-26
  • Phase 3: Pipeline Integration and MVP - 2/2 plans — completed 2026-03-26
  • Phase 4: Power User Features - 2/2 plans — completed 2026-03-26

Full details: .planning/milestones/v1.0-ROADMAP.md

v1.1 Custom Sound Mappings (Phases 5-7) — SHIPPED 2026-03-26
  • Phase 5: Waveform Types and Bank Decoupling - 2/2 plans — completed 2026-03-26
  • Phase 6: Config Package and Sound Overrides - 2/2 plans — completed 2026-03-26
  • Phase 7: Custom Rules and Print-Config - 2/2 plans — completed 2026-03-26

Full details: .planning/milestones/v1.1-ROADMAP.md

Progress

Phase Milestone Plans Complete Status Completed
1. Capture and Classification v1.0 4/4 Complete 2026-03-25
2. Audio Synthesis Engine v1.0 3/3 Complete 2026-03-26
3. Pipeline Integration and MVP v1.0 2/2 Complete 2026-03-26
4. Power User Features v1.0 2/2 Complete 2026-03-26
5. Waveform Types and Bank Decoupling v1.1 2/2 Complete 2026-03-26
6. Config Package and Sound Overrides v1.1 2/2 Complete 2026-03-26
7. Custom Rules and Print-Config v1.1 2/2 Complete 2026-03-26