Files
yoloyolo/.planning/ROADMAP.md
T
gurixandClaude Opus 4.6 1230fd1b9d chore: archive v1.0 MVP milestone
Archive roadmap and requirements to milestones/, reorganize ROADMAP.md,
evolve PROJECT.md with shipped state, create retrospective.

4 phases, 11 plans, 16/16 requirements — all complete.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 15:23:04 +01:00

956 B

Roadmap: NetSynth

Milestones

  • v1.0 MVP — Phases 1-4 (shipped 2026-03-26)

Phases

v1.0 MVP (Phases 1-4) — SHIPPED 2026-03-26
  • Phase 1: Capture and Classification (4/4 plans) — completed 2026-03-25
  • Phase 2: Audio Synthesis Engine (3/3 plans) — completed 2026-03-26
  • Phase 3: Pipeline Integration and MVP (2/2 plans) — completed 2026-03-26
  • Phase 4: Power User Features (2/2 plans) — completed 2026-03-26

Full details: .planning/milestones/v1.0-ROADMAP.md

Progress

Phase Milestone Plans Complete Status Completed
1. Capture and Classification v1.0 4/4 Complete 2026-03-25
2. Audio Synthesis Engine v1.0 3/3 Complete 2026-03-26
3. Pipeline Integration and MVP v1.0 2/2 Complete 2026-03-26
4. Power User Features v1.0 2/2 Complete 2026-03-26