Files
gurixandClaude Opus 4.6 494385b528 chore: archive v1.2 milestone — Extended Protocol Coverage
35 traffic classes across 9 protocol families shipped. Archives
ROADMAP, REQUIREMENTS, and phase directories to milestones/v1.2-*.
Updates README with new protocol families, sound design table,
and [groups] TOML config documentation.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-27 16:48:53 +01:00

61 lines
2.5 KiB
Markdown

# Roadmap: NetSynth
## Milestones
-**v1.0 MVP** — Phases 1-4 (shipped 2026-03-26)
-**v1.1 Custom Sound Mappings** — Phases 5-7 (shipped 2026-03-26)
-**v1.2 Extended Protocol Coverage** — Phases 8-11 (shipped 2026-03-27)
## Phases
<details>
<summary>✅ v1.0 MVP (Phases 1-4) — SHIPPED 2026-03-26</summary>
- [x] **Phase 1: Capture and Classification** - 4/4 plans — completed 2026-03-25
- [x] **Phase 2: Audio Synthesis Engine** - 3/3 plans — completed 2026-03-26
- [x] **Phase 3: Pipeline Integration and MVP** - 2/2 plans — completed 2026-03-26
- [x] **Phase 4: Power User Features** - 2/2 plans — completed 2026-03-26
Full details: `.planning/milestones/v1.0-ROADMAP.md`
</details>
<details>
<summary>✅ v1.1 Custom Sound Mappings (Phases 5-7) — SHIPPED 2026-03-26</summary>
- [x] **Phase 5: Waveform Types and Bank Decoupling** - 2/2 plans — completed 2026-03-26
- [x] **Phase 6: Config Package and Sound Overrides** - 2/2 plans — completed 2026-03-26
- [x] **Phase 7: Custom Rules and Print-Config** - 2/2 plans — completed 2026-03-26
Full details: `.planning/milestones/v1.1-ROADMAP.md`
</details>
<details>
<summary>✅ v1.2 Extended Protocol Coverage (Phases 8-11) — SHIPPED 2026-03-27</summary>
- [x] **Phase 8: Test and Constant Cleanup** - 1/1 plans — completed 2026-03-27
- [x] **Phase 9: Frequency Design and Group Architecture** - 2/2 plans — completed 2026-03-27
- [x] **Phase 10: Classification Layer** - 2/2 plans — completed 2026-03-27
- [x] **Phase 11: Synthesis and Config Layer** - 2/2 plans — completed 2026-03-27
Full details: `.planning/milestones/v1.2-ROADMAP.md`
</details>
## Progress
| Phase | Milestone | Plans Complete | Status | Completed |
|-------|-----------|----------------|--------|-----------|
| 1. Capture and Classification | v1.0 | 4/4 | Complete | 2026-03-25 |
| 2. Audio Synthesis Engine | v1.0 | 3/3 | Complete | 2026-03-26 |
| 3. Pipeline Integration and MVP | v1.0 | 2/2 | Complete | 2026-03-26 |
| 4. Power User Features | v1.0 | 2/2 | Complete | 2026-03-26 |
| 5. Waveform Types and Bank Decoupling | v1.1 | 2/2 | Complete | 2026-03-26 |
| 6. Config Package and Sound Overrides | v1.1 | 2/2 | Complete | 2026-03-26 |
| 7. Custom Rules and Print-Config | v1.1 | 2/2 | Complete | 2026-03-26 |
| 8. Test and Constant Cleanup | v1.2 | 1/1 | Complete | 2026-03-27 |
| 9. Frequency Design and Group Architecture | v1.2 | 2/2 | Complete | 2026-03-27 |
| 10. Classification Layer | v1.2 | 2/2 | Complete | 2026-03-27 |
| 11. Synthesis and Config Layer | v1.2 | 2/2 | Complete | 2026-03-27 |