Files
yoloyolo/.planning/ROADMAP.md
T
gurixandClaude Opus 4.6 494385b528 chore: archive v1.2 milestone — Extended Protocol Coverage
35 traffic classes across 9 protocol families shipped. Archives
ROADMAP, REQUIREMENTS, and phase directories to milestones/v1.2-*.
Updates README with new protocol families, sound design table,
and [groups] TOML config documentation.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-27 16:48:53 +01:00

2.5 KiB

Roadmap: NetSynth

Milestones

  • v1.0 MVP — Phases 1-4 (shipped 2026-03-26)
  • v1.1 Custom Sound Mappings — Phases 5-7 (shipped 2026-03-26)
  • v1.2 Extended Protocol Coverage — Phases 8-11 (shipped 2026-03-27)

Phases

v1.0 MVP (Phases 1-4) — SHIPPED 2026-03-26
  • Phase 1: Capture and Classification - 4/4 plans — completed 2026-03-25
  • Phase 2: Audio Synthesis Engine - 3/3 plans — completed 2026-03-26
  • Phase 3: Pipeline Integration and MVP - 2/2 plans — completed 2026-03-26
  • Phase 4: Power User Features - 2/2 plans — completed 2026-03-26

Full details: .planning/milestones/v1.0-ROADMAP.md

v1.1 Custom Sound Mappings (Phases 5-7) — SHIPPED 2026-03-26
  • Phase 5: Waveform Types and Bank Decoupling - 2/2 plans — completed 2026-03-26
  • Phase 6: Config Package and Sound Overrides - 2/2 plans — completed 2026-03-26
  • Phase 7: Custom Rules and Print-Config - 2/2 plans — completed 2026-03-26

Full details: .planning/milestones/v1.1-ROADMAP.md

v1.2 Extended Protocol Coverage (Phases 8-11) — SHIPPED 2026-03-27
  • Phase 8: Test and Constant Cleanup - 1/1 plans — completed 2026-03-27
  • Phase 9: Frequency Design and Group Architecture - 2/2 plans — completed 2026-03-27
  • Phase 10: Classification Layer - 2/2 plans — completed 2026-03-27
  • Phase 11: Synthesis and Config Layer - 2/2 plans — completed 2026-03-27

Full details: .planning/milestones/v1.2-ROADMAP.md

Progress

Phase Milestone Plans Complete Status Completed
1. Capture and Classification v1.0 4/4 Complete 2026-03-25
2. Audio Synthesis Engine v1.0 3/3 Complete 2026-03-26
3. Pipeline Integration and MVP v1.0 2/2 Complete 2026-03-26
4. Power User Features v1.0 2/2 Complete 2026-03-26
5. Waveform Types and Bank Decoupling v1.1 2/2 Complete 2026-03-26
6. Config Package and Sound Overrides v1.1 2/2 Complete 2026-03-26
7. Custom Rules and Print-Config v1.1 2/2 Complete 2026-03-26
8. Test and Constant Cleanup v1.2 1/1 Complete 2026-03-27
9. Frequency Design and Group Architecture v1.2 2/2 Complete 2026-03-27
10. Classification Layer v1.2 2/2 Complete 2026-03-27
11. Synthesis and Config Layer v1.2 2/2 Complete 2026-03-27