# Roadmap: NetSynth
|
|
|
|
## Milestones
|
|
|
|
- **v1.0 MVP** — Phases 1-4 (shipped 2026-03-26)
|
|
|
|
## Phases
|
|
|
|
<details>
|
|
<summary>v1.0 MVP (Phases 1-4) — SHIPPED 2026-03-26</summary>
|
|
|
|
- [x] Phase 1: Capture and Classification (4/4 plans) — completed 2026-03-25
|
|
- [x] Phase 2: Audio Synthesis Engine (3/3 plans) — completed 2026-03-26
|
|
- [x] Phase 3: Pipeline Integration and MVP (2/2 plans) — completed 2026-03-26
|
|
- [x] Phase 4: Power User Features (2/2 plans) — completed 2026-03-26
|
|
|
|
Full details: `.planning/milestones/v1.0-ROADMAP.md`
|
|
|
|
</details>
|
|
|
|
## Progress
|
|
|
|
| Phase | Milestone | Plans Complete | Status | Completed |
|
|
|-------|-----------|----------------|--------|-----------|
|
|
| 1. Capture and Classification | v1.0 | 4/4 | Complete | 2026-03-25 |
|
|
| 2. Audio Synthesis Engine | v1.0 | 3/3 | Complete | 2026-03-26 |
|
|
| 3. Pipeline Integration and MVP | v1.0 | 2/2 | Complete | 2026-03-26 |
|
|
| 4. Power User Features | v1.0 | 2/2 | Complete | 2026-03-26 |
|