docs(03-01): complete data layer foundation plan
- SUMMARY.md with execution results - STATE.md updated with position and decisions - ROADMAP.md updated with plan progress Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,125 @@
|
||||
---
|
||||
phase: 03-komplettes-spielerlebnis
|
||||
plan: 01
|
||||
subsystem: game-data
|
||||
tags: [word-lists, typing, progress-tracking, rate-limiting]
|
||||
|
||||
requires:
|
||||
- phase: 01-technische-basis
|
||||
provides: "Level definitions with allKeys, Progress interface, IndexedDB storage"
|
||||
- phase: 02-gemini-integration
|
||||
provides: "Gemini API with rate limiting"
|
||||
provides:
|
||||
- "Static word lists per level (1-6) with getWordsForLevel()"
|
||||
- "Extended Progress interface with accuracy tracking fields"
|
||||
- "LessonPhase type (discover | practice | words)"
|
||||
- "Updated rate limits: 10 text / 5 image per day"
|
||||
affects: [03-02-lesson-flow, 03-03-reward-system, 03-04-parent-area]
|
||||
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns: ["TDD for game data validation", "letter-only validation against level allKeys"]
|
||||
|
||||
key-files:
|
||||
created:
|
||||
- src/game/words.ts
|
||||
- src/game/words.test.ts
|
||||
modified:
|
||||
- src/types.ts
|
||||
- src/api/gemini.ts
|
||||
- src/ui/screens.ts
|
||||
- src/api/gemini.test.ts
|
||||
- src/storage/db.test.ts
|
||||
|
||||
key-decisions:
|
||||
- "Levels 1-2 use letter combos (no real German words possible with F/J/D/K)"
|
||||
- "Rate limits raised to 10 text / 5 image per day for real usage"
|
||||
|
||||
patterns-established:
|
||||
- "Word list validation: every word checked against getKeysUpToLevel() at test time"
|
||||
|
||||
requirements-completed: [LEVL-04, TYPE-06]
|
||||
|
||||
duration: 3min
|
||||
completed: 2026-03-29
|
||||
---
|
||||
|
||||
# Phase 03 Plan 01: Data Layer Foundation Summary
|
||||
|
||||
**Word lists for levels 1-6 with TDD validation, extended Progress with accuracy stats, rate limits 10/5 per day**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** 3 min
|
||||
- **Started:** 2026-03-29T11:39:57Z
|
||||
- **Completed:** 2026-03-29T11:42:37Z
|
||||
- **Tasks:** 2
|
||||
- **Files modified:** 7
|
||||
|
||||
## Accomplishments
|
||||
- Word lists for levels 1-6 (8-10 words each), validated to only use learned letters per level
|
||||
- getWordsForLevel() with without-replacement and with-replacement sampling
|
||||
- Progress interface extended with totalCorrect, totalErrors, errorKeyCounts, lastPlayedLevels
|
||||
- LessonPhase type exported for lesson flow phases
|
||||
- Rate limits updated from 1/1 to 10 text / 5 image per day
|
||||
|
||||
## Task Commits
|
||||
|
||||
Each task was committed atomically:
|
||||
|
||||
1. **Task 1: Word lists per level with validation tests** - `420c0e1` (test: RED), `5a6ba70` (feat: GREEN)
|
||||
2. **Task 2: Extend Progress type and update rate limits** - `d4207bf` (feat)
|
||||
|
||||
## Files Created/Modified
|
||||
- `src/game/words.ts` - Static word lists per level, getWordsForLevel() function
|
||||
- `src/game/words.test.ts` - 8 tests validating word lists against level keys
|
||||
- `src/types.ts` - Extended Progress interface, new LessonPhase type
|
||||
- `src/api/gemini.ts` - Rate limit constants TEXT_RATE_LIMIT=10, IMAGE_RATE_LIMIT=5
|
||||
- `src/ui/screens.ts` - New Progress field defaults in welcome screen
|
||||
- `src/api/gemini.test.ts` - Updated rate limit tests for new limits
|
||||
- `src/storage/db.test.ts` - Updated Progress test fixture with new fields
|
||||
|
||||
## Decisions Made
|
||||
- Levels 1-2 use letter combination patterns since no real German words can be formed with only F/J/D/K
|
||||
- Rate limits raised to 10 text / 5 image per day (was 1 each) for practical usage
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
### Auto-fixed Issues
|
||||
|
||||
**1. [Rule 1 - Bug] Fixed invalid letters in word lists**
|
||||
- **Found during:** Task 1 (TDD GREEN phase)
|
||||
- **Issue:** Plan's suggested words contained letters not in level allKeys (e.g., "halb" has "b" not in level 5, "salad" has letters not in level 4)
|
||||
- **Fix:** Replaced invalid words with valid alternatives using only level-appropriate letters
|
||||
- **Files modified:** src/game/words.ts
|
||||
- **Verification:** All 8 word validation tests pass
|
||||
- **Committed in:** 5a6ba70 (Task 1 GREEN commit)
|
||||
|
||||
**2. [Rule 1 - Bug] Updated existing tests for new rate limits and Progress shape**
|
||||
- **Found during:** Task 2 (verification step)
|
||||
- **Issue:** Existing tests expected old rate limit of 1 and old Progress shape without new fields
|
||||
- **Fix:** Updated gemini.test.ts to call incrementApiCall 10/5 times, added new fields to db.test.ts fixture
|
||||
- **Files modified:** src/api/gemini.test.ts, src/storage/db.test.ts
|
||||
- **Verification:** All 76 tests pass, tsc --noEmit clean
|
||||
- **Committed in:** d4207bf (Task 2 commit)
|
||||
|
||||
---
|
||||
|
||||
**Total deviations:** 2 auto-fixed (2 bugs)
|
||||
**Impact on plan:** Both fixes necessary for correctness. No scope creep.
|
||||
|
||||
## Issues Encountered
|
||||
None beyond the auto-fixed deviations above.
|
||||
|
||||
## User Setup Required
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
- Word lists ready for lesson flow (03-02)
|
||||
- Progress stats fields ready for parent area (03-04)
|
||||
- LessonPhase type ready for lesson screen phases (03-02)
|
||||
- Rate limits configured for reward system API calls (03-03)
|
||||
|
||||
---
|
||||
*Phase: 03-komplettes-spielerlebnis*
|
||||
*Completed: 2026-03-29*
|
||||
Reference in New Issue
Block a user